To the central content area

110 Annual Soil and Groundwater Pollution Survey and Verification Work Plan - Keelung City

Absrtact
Funding for this project comes from a subsidy of 6.83 million yuan from the Environmental Protection Agency of the Executive Yuan, and a subsidy of 1.56 million yuan from fundraising, totaling NT$8.39 million. The overall plan implementation progress has reached 100%, and the highlights are summarized as follows: The 101 (C00033) groundwater monitoring wells in Liudu Hebin Sports Park were all lower than the monitoring standards during dry and wet seasons. The internal functions of the other 29 groundwater monitoring wells were normal. Except for the slow return of Xingye Metal, the other The water condition is medium. The regional monitoring well was built in Germany and found that it could not be found due to the construction of the school during the inspection in the second half of the year, and reported to the Environmental Protection Bureau for follow-up well restoration. The groundwater of Badouzi Fishing Boat Gas Station was gray-black with oil pollution. Immediately notify the Environmental Protection Bureau and ask the station to activate an emergency response and carry out oil slick pumping operations. It has completed the repair work of Fuji Weaving (next to the guard house), 101 of Liudu Riverside Sports Park in Qidu District, Longsheng Elementary School and Shenmei Small Groundwater Monitoring Well. 8 management sites (6 control sites and 2 limited improvement sites) have completed 20 inspections each. The third change plan of Quanyi Gas Station has been approved, and the improvement period is 22 months; the groundwater remediation system and operation progress of Beining Road Gas Station have been delayed, and the site has accelerated the implementation of related operations. The construction waste and the off-site vehicle GPS are not connected to the law; the verification of China's electronic soil and groundwater has been lower than the control standard during the wet season, and the delisting can be released when the dry season is verified to be lower than the control standard; the original time limit to improve the oil supply service of the site Shimen The center (Badu Reservoir Area) and Keelung Oil Supply Service Center have not completed the pollution improvement within the time limit. They have been announced as soil pollution control sites by the Environmental Protection Bureau. The control plan has been approved, and the Badou fishing boat gas station control plan has been approved. ; Minghong Fishing Bank verified sampling at 5 points, 1 point TPH exceeded the control standard, and improved within a time limit; He Quanying's necessary measures plan has been approved. There was no abnormality in the first and second quarters of the report and review of the underground storage tank, and the EPA letter of the third quarter was notified in the first quarter of 2011 and reviewed at the same time. In addition, 40 stations (184 storage tanks) were surveyed, and a tracking improvement counseling meeting was held on October 25, 2011. 4 stations are excluded from the management list, 4 stations are in compliance with the relevant provisions of the storage system measures, Keelung Oil Supply Service Center, Shimen Oil Supply Service Center, Shimen Oil Supply Service Center (Badu Reservoir Area), Badouzi Fishing Boat Gas Station, Heping Island Fishing Boat Gas Station , the improvement plan was submitted online before the end of June, and the parts with missing parts in the review were returned, and the revised version was submitted for review in October. Improvements have been completed for 5 stations and have been submitted to the Environmental Protection Bureau for future reference. The remaining 21 stations should submit improvement plans before December 31, 2011. A total of 9 factories were closed by letter from the Production and Development Office, all of which are not public institutions and do not require on-site surveys. In addition, 6 institutions submitted application materials on their own, and 4 on-site surveys were conducted, and a total of 16 cases were reviewed. In addition, 10 public surveys have been completed. According to the survey results and weights, the priority entry survey list is selected. Taiwan Fertilizer Co., Ltd. Keelung Plant, Fuji Innovative Materials Co., Ltd. and Songding Industrial Co., Ltd., the soil test results are all low on monitoring standards. A total of 3 regulatory publicity and briefing sessions were completed, with a total of 105 attendees, and more than 70-80% of the attendees knew the key points of relevant regulations. In addition to the production of 5 sets of AR animations according to the contract, 3 sets of AR animations will be produced with additional value and the AR animations produced in 2010 will be optimized. What are you crying for?" A picture book and a letter of the APP user manual were sent to 41 primary schools and 10 libraries within the jurisdiction. So far, there is no need for emergency response. In addition, Dawulun Industrial Zone has declared and completed the inspection work as scheduled for 110 years. The results of regular monitoring are all lower than the control standards. The score on the system is 76.57 points, and the deduction item is the site administrative process control project - the completion stage of China Electronics Improvement. The Environmental Protection Bureau recommends uploading the records of the earth-moving meeting. Uploading will result in deduction of points for overdue recognition by the system (the deadline for uploading official documents is 10 days). However, the Environmental Protection Agency instructed that it needs to be uploaded to facilitate the complete management of the site, so the deduction of points was caused. Points lost will not be adjusted. In addition, according to the instructions of the Environmental Protection Bureau, Hong Yuhang should complete the delisting before the end of the year and include it in the weight of the site delisting project. However, the TPH of the entry verification result still exceeds the control standard, so it cannot complete the delisting before the end of the year and loses points. Others Most of the items that have not been scored are due to the systematic stage scoring.
Keyword
Soil and groundwater
Open
top